I spent last Saturday straightening up the hangar some. When we moved in just before Christmas, the hangar was a convenient deposit location for a lot of stuff. Some of that stuff has slowly migrated into the house. I sorted out what remained (which is a lot) and added enough order I could finally get to 98K in the back corner of the hangar. The Stinson had been sitting there since mid August and had a lot of dry wall dust on it, though it had been under tarps.
So, Sunday after church, I rolled 98K out onto the ramp. With a good breeze blowing in addition to the power of a leaf blower, I was able to get 80% of the dust off. Now I will divide my time between unpacking boxes and getting some work accomplished on 98K. Stay tuned.....
